i | Agricultural Land | Panagudi Surevy No 33/1A
Total Area 0.6000
Built Up Area
Whether Inherited N
Purchase Date 2011-08-12
Purchase Cost 72600.00
Development Cost 0.00 89,600 89 Thou+
Levinjipura Survey no 727/1
Total Area 0.3300
Built Up Area
Whether Inherited N
Purchase Date 0000-00-00
Purchase Cost 34800.00
Development Cost 0.00 1,79,100 1 Lacs+
Levinjipura Survey no 697/6
Total Area 0.3200
Built Up Area
Whether Inherited N
Purchase Date 2009-10-21
Purchase Cost 45500.00
Development Cost 0.00 1,73,700 1 Lacs+
Levinjipura Survey no697/7
Total Area 0.6400
Built Up Area
Whether Inherited N
Purchase Date 2009-10-21
Purchase Cost 91000.00
Development Cost 0.00 3,47,300 3 Lacs+
Levinjipura Survey no 697/8
Total Area 0.3500
Built Up Area
Whether Inherited N
Purchase Date 2009-10-21
Purchase Cost 49000.00
Development Cost 0.00 1,89,900 1 Lacs+
Levinjipura Survey no 697/9
Total Area 0.3500
Built Up Area
Whether Inherited N
Purchase Date 2009-10-21
Purchase Cost 49000.00
Development Cost 0.00 1,89,900 1 Lacs+
Levinjipura Survey no 697/10
Total Area 0.6200
Built Up Area
Whether Inherited N
Purchase Date 2009-10-21
Purchase Cost 87500.00
Development Cost 0.00 3,36,400 3 Lacs+
Levinjipura Survey no 690/3
Total Area 0.0100
Built Up Area
Whether Inherited N
Purchase Date 2009-10-21
Purchase Cost 1750.00
Development Cost 0.00 2,000 2 Thou+
Levinjipura Survey no 697/2
Total Area 0.3000
Built Up Area
Whether Inherited N
Purchase Date 2009-10-21
Purchase Cost 42000.00
Development Cost 0.00 1,62,800 1 Lacs+
Levinjipura Survey no697/3
Total Area 0.3000
Built Up Area
Whether Inherited N
Purchase Date 2009-10-21
Purchase Cost 42000.00
Development Cost 0.00 1,62,800 1 Lacs+
Levinjipura Survey no 697/5
Total Area 0.3700
Built Up Area
Whether Inherited N
Purchase Date 2009-10-21
Purchase Cost 52500.00
Development Cost 0.00 2,00,800 2 Lacs+
Levinjipura Survey no 737/2A
Total Area 1.3200
Built Up Area
Whether Inherited N
Purchase Date 2010-12-27
Purchase Cost 139100.00
Development Cost 0.00 7,16,200 7 Lacs+
Levinjipura Survey no 737/2C3A
Total Area 0.9900
Built Up Area
Whether Inherited N
Purchase Date 2012-12-27
Purchase Cost 104000.00
Development Cost 0.00 5,37,100 5 Lacs+
Levinjipura Survey no 718/2A2
Total Area 0.4200
Built Up Area
Whether Inherited N
Purchase Date 2004-03-31
Purchase Cost 10500.00
Development Cost 0.00 78,900 78 Thou+
Levinjipura Survey no 718/2C2
Total Area 0.0500
Built Up Area
Whether Inherited N
Purchase Date 2004-03-31
Purchase Cost 1250.00
Development Cost 0.00 9,400 9 Thou+
Levinjipura Survey no 718/2C5
Total Area 0.1100
Built Up Area
Whether Inherited N
Purchase Date 2004-03-31
Purchase Cost 13475.00
Development Cost 0.00 28,800 28 Thou+
Levinjipura Survey no 94/1
Total Area 4.6400
Built Up Area
Whether Inherited N
Purchase Date 2011-11-25
Purchase Cost 650000.00
Development Cost 0.00 7,55,200 7 Lacs+
Levinjipura Survey no 158/1A
Total Area 0.1700
Built Up Area
Whether Inherited N
Purchase Date 2011-11-25
Purchase Cost 23900.00
Development Cost 0.00 7,84,600 7 Lacs+
Levinjipura Survey no 158/1E
Total Area 0.8800
Built Up Area
Whether Inherited N
Purchase Date 2011-11-25
Purchase Cost 123300.00
Development Cost 0.00 3,53,800 3 Lacs+
Levinjipura Survey no 161/1A
Total Area 0.6900
Built Up Area
Whether Inherited N
Purchase Date 2011-11-25
Purchase Cost 96700.00
Development Cost 0.00 2,77,400 2 Lacs+
Levinjipura Survey no 161/1B
Total Area 0.7000
Built Up Area
Whether Inherited N
Purchase Date 2011-11-25
Purchase Cost 98100.00
Development Cost 0.00 2,81,500 2 Lacs+
Levinjipura Survey no 160
Total Area 0.2800
Built Up Area
Whether Inherited N
Purchase Date 2011-11-25
Purchase Cost 39300.00
Development Cost 0.00 1,12,600 1 Lacs+
Levinjipura Survey no 161/2A
Total Area 0.7800
Built Up Area
Whether Inherited N
Purchase Date 2011-11-25
Purchase Cost 193000.00
Development Cost 0.00 3,13,600 3 Lacs+
Levinjipura Survey no 162/2
Total Area 0.0300
Built Up Area
Whether Inherited N
Purchase Date 2011-11-25
Purchase Cost 4300.00
Development Cost 0.00 12,100 12 Thou+
Levinjipura Survey no 70/1C
Total Area 0.1700
Built Up Area
Whether Inherited N
Purchase Date 2012-03-31
Purchase Cost 11100.00
Development Cost 0.00 7,84,600 7 Lacs+
Levinjipura Survey no 70/1D
Total Area 0.0650
Built Up Area
Whether Inherited N
Purchase Date 2012-03-31
Purchase Cost 4300.00
Development Cost 0.00 3,00,000 3 Lacs+
Levinjipura Survey no 732/1C
Total Area 0.4900
Built Up Area
Whether Inherited N
Purchase Date 2010-07-02
Purchase Cost 535600.00
Development Cost 0.00 22,61,300 22 Lacs+
KarunKula Survey no 533/2
Total Area 8.5900
Built Up Area
Whether Inherited N
Purchase Date 2009-12-30
Purchase Cost 158485.00
Development Cost 0.00 85,90,000 85 Lacs+
KarunKula Survey no 550/1D
Total Area 0.1000
Built Up Area
Whether Inherited N
Purchase Date 2009-12-30
Purchase Cost 18450.00
Development Cost 0.00 18,500 18 Thou+
KarunKula Survey no 550/1E
Total Area 1.0000
Built Up Area
Whether Inherited N
Purchase Date 2009-12-30
Purchase Cost 184500.00
Development Cost 0.00 1,85,000 1 Lacs+
KarunKula Survey no 550/3
Total Area 0.2100
Built Up Area
Whether Inherited N
Purchase Date 2009-12-30
Purchase Cost 38745.00
Development Cost 0.00 39,000 39 Thou+
Pazhavoor survey no 1406/2
Total Area 1.8000
Built Up Area
Whether Inherited N
Purchase Date 2010-03-03
Purchase Cost 75000.00
Development Cost 0.00 3,45,100 3 Lacs+
Pazhavoor survey no 1406/2
Total Area 1.2000
Built Up Area
Whether Inherited N
Purchase Date 2009-07-03
Purchase Cost 49900.00
Development Cost 0.00 2,30,100 2 Lacs+
Pazhavoor survey no 1286/1E
Total Area 0.0369
Built Up Area
Whether Inherited N
Purchase Date 2013-08-26
Purchase Cost 34500.00
Development Cost 0.00 34,500 34 Thou+
Pazhavoor survey no 849
Total Area 0.5700
Built Up Area
Whether Inherited N
Purchase Date 2012-08-22
Purchase Cost 114100.00
Development Cost 0.00 1,15,000 1 Lacs+
Pazhavoor survey no 1408/1
Total Area 2.1400
Built Up Area
Whether Inherited N
Purchase Date 2001-01-24
Purchase Cost 47936.00
Development Cost 0.00 8,60,400 8 Lacs+
Pazhavoor survey no 1408/2
Total Area 0.0500
Built Up Area
Whether Inherited N
Purchase Date 2001-01-24
Purchase Cost 1120.00
Development Cost 0.00 20,200 20 Thou+
Pazhavoor survey no 1407/2
Total Area 0.0500
Built Up Area
Whether Inherited N
Purchase Date 2001-01-24
Purchase Cost 944.00
Development Cost 0.00 20,200 20 Thou+
Pazhavoor survey no 1382/3
Total Area 0.0700
Built Up Area
Whether Inherited N
Purchase Date 1996-03-21
Purchase Cost 1400.00
Development Cost 0.00 13,500 13 Thou+
Pazhavoor survey no 1381/2D
Total Area 0.1300
Built Up Area
Whether Inherited N
Purchase Date 1996-03-21
Purchase Cost 2600.00
Development Cost 0.00 25,000 25 Thou+
Pazhavoor survey no 1312/4
Total Area 0.3400
Built Up Area
Whether Inherited N
Purchase Date 2000-10-13
Purchase Cost 17000.00
Development Cost 0.00 1,36,700 1 Lacs+
Pazhavoor survey no 1312/4
Total Area 0.3400
Built Up Area
Whether Inherited N
Purchase Date 1996-03-21
Purchase Cost 17000.00
Development Cost 0.00 1,36,700 1 Lacs+
Pazhavoor survey no 1390/1,2
Total Area 43400
Built Up Area
Whether Inherited N
Purchase Date 2004-12-06
Purchase Cost 173600.00
Development Cost 0.00 23,54,500 23 Lacs+
Pazhavoor survey no 1289
Total Area 0.6200
Built Up Area
Whether Inherited N
Purchase Date 2007-02-21
Purchase Cost 62000.00
Development Cost 0.00 16,31,400 16 Lacs+
Pazhavoor survey no 1286/2
Total Area 1.0100
Built Up Area
Whether Inherited N
Purchase Date 2001-02-01
Purchase Cost 50000.00
Development Cost 0.00 4,06,100 4 Lacs+
Pazhavoor survey no 1197
Total Area 2.5000
Built Up Area
Whether Inherited N
Purchase Date 2011-12-26
Purchase Cost 103800.00
Development Cost 0.00 4,79,300 4 Lacs+
Pazhavoor survey no 1292/14
Total Area 0.1200
Built Up Area
Whether Inherited N
Purchase Date 2011-12-29
Purchase Cost 7900.00
Development Cost 0.00 23,000 23 Thou+
Pazhavoor survey no 1253/1
Total Area 0.1000
Built Up Area
Whether Inherited N
Purchase Date 2000-05-04
Purchase Cost 2500.00
Development Cost 0.00 17,500 17 Thou+
Pazhavoor survey no 1378/1B
Total Area 0.0900
Built Up Area
Whether Inherited N
Purchase Date 2009-07-03
Purchase Cost 3736.00
Development Cost 0.00 36,200 36 Thou+
Pazhavoor survey no 1385/1-3
Total Area 2.2400
Built Up Area
Whether Inherited N
Purchase Date 2009-07-03
Purchase Cost 93000.00
Development Cost 0.00 4,29,500 4 Lacs+
Pazhavoor survey no 1377/4B
Total Area 0.2550
Built Up Area
Whether Inherited N
Purchase Date 2009-07-03
Purchase Cost 40840.00
Development Cost 0.00 1,02,550 1 Lacs+
Pazhavoor survey no 1377/1C
Total Area 0.2550
Built Up Area
Whether Inherited N
Purchase Date 2009-07-03
Purchase Cost 40840.00
Development Cost 0.00 1,02,550 1 Lacs+
Pazhavoor survey no 839/2A
Total Area 0.1000
Built Up Area
Whether Inherited N
Purchase Date 2002-02-22
Purchase Cost 2900.00
Development Cost 0.00 19,200 19 Thou+
Pazhavoor survey no 1407/2
Total Area 1.4800
Built Up Area
Whether Inherited N
Purchase Date 1998-07-02
Purchase Cost 22200.00
Development Cost 0.00 5,95,000 5 Lacs+
Pazhavoor survey no 1408/2
Total Area 2.3500
Built Up Area
Whether Inherited N
Purchase Date 1998-07-02
Purchase Cost 35250.00
Development Cost 0.00 9,44,800 9 Lacs+
Pazhavoor survey no 1407/2
Total Area 0.2100
Built Up Area
Whether Inherited N
Purchase Date 1998-07-02
Purchase Cost 3150.00
Development Cost 0.00 84,500 84 Thou+
Pazhavoor survey no 1407/3
Total Area 0.5850
Built Up Area
Whether Inherited N
Purchase Date 2001-01-25
Purchase Cost 29250.00
Development Cost 0.00 1,12,200 1 Lacs+
Pazhavoor survey no 1407/6C
Total Area 0.5450
Built Up Area
Whether Inherited N
Purchase Date 2001-01-25
Purchase Cost 27250.00
Development Cost 0.00 2,95,700 2 Lacs+
Pazhavoor survey no 1407/1
Total Area 0.0400
Built Up Area
Whether Inherited N
Purchase Date 2001-01-25
Purchase Cost 11500.00
Development Cost 0.00 21,800 21 Thou+
Pazhavoor survey no 1406/1C
Total Area 0.7700
Built Up Area
Whether Inherited N
Purchase Date 2001-01-25
Purchase Cost 30800.00
Development Cost 0.00 4,17,800 4 Lacs+
Pazhavoor survey no 1407/4
Total Area 1.6100
Built Up Area
Whether Inherited N
Purchase Date 0000-00-00
Purchase Cost 56350.00
Development Cost 0.00 3,08,700 3 Lacs+
Pazhavoor survey no 1407/5
Total Area 2.0600
Built Up Area
Whether Inherited N
Purchase Date 1998-07-03
Purchase Cost 113300.00
Development Cost 0.00 3,95,000 3 Lacs+
Pazhavoor survey no 1407/6A
Total Area 0.5700
Built Up Area
Whether Inherited N
Purchase Date 1998-07-03
Purchase Cost 27300.00
Development Cost 0.00 1,09,600 1 Lacs+
Pazhavoor survey no 1407/1
Total Area 0.0800
Built Up Area
Whether Inherited N
Purchase Date 1998-07-03
Purchase Cost 19350.00
Development Cost 0.00 43,500 43 Thou+
Pazhavoor survey no 1406/1C
Total Area 0.8000
Built Up Area
Whether Inherited N
Purchase Date 1998-07-03
Purchase Cost 32000.00
Development Cost 0.00 4,34,100 4 Lacs+
Pazhavoor survey no 1407/6B
Total Area 0.7175
Built Up Area
Whether Inherited N
Purchase Date 2000-07-03
Purchase Cost 35875.00
Development Cost 0.00 1,37,600 1 Lacs+
Pazhavoor survey no 1407/3
Total Area 0.2925
Built Up Area
Whether Inherited N
Purchase Date 2000-07-03
Purchase Cost 14625.00
Development Cost 0.00 56,100 56 Thou+
Pazhavoor survey no 1407/1
Total Area 0.0200
Built Up Area
Whether Inherited N
Purchase Date 2000-07-03
Purchase Cost 4350.00
Development Cost 0.00 10,900 10 Thou+
Pazhavoor survey no 1288/1
Total Area 0.0800
Built Up Area
Whether Inherited N
Purchase Date 2011-12-19
Purchase Cost 132800.00
Development Cost 0.00 2,10,500 2 Lacs+
Pazhavoor survey no 1288
Total Area 0.5290
Built Up Area
Whether Inherited N
Purchase Date 1998-09-23
Purchase Cost 28037.00
Development Cost 0.00 13,91,900 13 Lacs+
Pazhavoor survey no 1288
Total Area 0.1360
Built Up Area
Whether Inherited N
Purchase Date 1998-09-23
Purchase Cost 7208.00
Development Cost 0.00 3,57,900 3 Lacs+
Pazhavoor survey no 839/2A
Total Area 1.3000
Built Up Area
Whether Inherited N
Purchase Date 2002-04-11
Purchase Cost 41210.00
Development Cost 0.00 2,49,300 2 Lacs+
Pazhavoor survey no 1284/1A, 2A
Total Area 0.3100
Built Up Area
Whether Inherited N
Purchase Date 2012-03-30
Purchase Cost 15062.00
Development Cost 0.00 59,500 59 Thou+
Pazhavoor survey no 611/1
Total Area 5.0350
Built Up Area
Whether Inherited N
Purchase Date 2019-10-19
Purchase Cost 420194.00
Development Cost 0.00 8,19,500 8 Lacs+
Pazhavoor survey no 1348/2B2
Total Area 4.5000
Built Up Area
Whether Inherited N
Purchase Date 1991-02-14
Purchase Cost 124080.00
Development Cost 0.00 12,21,650 12 Lacs+
Pazhavoor survey no 1348/2A
Total Area 0.0800
Built Up Area
Whether Inherited N
Purchase Date 1991-02-14
Purchase Cost 1920.00
Development Cost 0.00 21,750 21 Thou+
| Gnalam Survey no 83/5
Total Area 3.1900
Built Up Area
Whether Inherited N
Purchase Date 2004-05-27
Purchase Cost 279770.00
Development Cost 0.00 23,36,400 23 Lacs+
Gnalam Survey no 118/17
Total Area 0.1500
Built Up Area
Whether Inherited N
Purchase Date 2004-05-27
Purchase Cost 19602.00
Development Cost 0.00 7,40,800 7 Lacs+
Levinjipuram Survey No 744
Total Area 2.6364
Built Up Area
Whether Inherited N
Purchase Date 2015-03-23
Purchase Cost 527300.00
Development Cost 0.00 5,30,000 5 Lacs+
Levinjipuram survey no 744
Total Area 2.6000
Built Up Area
Whether Inherited N
Purchase Date 2015-03-23
Purchase Cost 570085.00
Development Cost 0.00 5,71,000 5 Lacs+
Levinjipuram Survey no 745/2A
Total Area 0.0500
Built Up Area
Whether Inherited N
Purchase Date 2015-03-23
Purchase Cost 16240.00
Development Cost 0.00 17,000 17 Thou+
Levinjipuram Survey no 740/1
Total Area 0.0350
Built Up Area
Whether Inherited N
Purchase Date 2015-03-23
Purchase Cost 11360.00
Development Cost 0.00 19,000 19 Thou+
Panagudi Survey No 51
Total Area 7.8800
Built Up Area
Whether Inherited N
Purchase Date 2004-12-07
Purchase Cost 664400.00
Development Cost 0.00 31,67,900 31 Lacs+
Pazhavvor Survey No 1293/7
Total Area 0.3400
Built Up Area
Whether Inherited N
Purchase Date 2004-12-07
Purchase Cost 18700.00
Development Cost 0.00 1,36,700 1 Lacs+
Pazhavvor Survey No 1293/7
Total Area 5.2400
Built Up Area
Whether Inherited N
Purchase Date 2002-10-11
Purchase Cost 180000.00
Development Cost 0.00 21,06,700 21 Lacs+
Pazhavvor Survey No 1285/1B
Total Area 0.1750
Built Up Area
Whether Inherited N
Purchase Date 1998-03-31
Purchase Cost 10500.00
Development Cost 0.00 26,800 26 Thou+
Pazhavvor Survey No 1285/3B
Total Area 0.0500
Built Up Area
Whether Inherited N
Purchase Date 1998-03-31
Purchase Cost 3000.00
Development Cost 0.00 7,700 7 Thou+
Pazhavvor Survey No 1284/2B
Total Area 0.0400
Built Up Area
Whether Inherited N
Purchase Date 1998-03-31
Purchase Cost 2400.00
Development Cost 0.00 6,200 6 Thou+
Pazhavvor Survey No 1284/2D
Total Area 0.3200
Built Up Area
Whether Inherited N
Purchase Date 1998-03-31
Purchase Cost 19200.00
Development Cost 0.00 48,900 48 Thou+
Pazhavvor Survey No 1285/3F
Total Area 0.2300
Built Up Area
Whether Inherited N
Purchase Date 1998-03-31
Purchase Cost 13800.00
Development Cost 0.00 1,24,800 1 Lacs+
Pazhavvor Survey No 1284/2A
Total Area 0.1250
Built Up Area
Whether Inherited N
Purchase Date 1995-08-03
Purchase Cost 2500.00
Development Cost 0.00 24,000 24 Thou+
Pazhavvor Survey No 1285/3A
Total Area 0.1400
Built Up Area
Whether Inherited N
Purchase Date 1995-08-03
Purchase Cost 2800.00
Development Cost 0.00 26,900 26 Thou+
Pazhavvor Survey No 1285/3B
Total Area 0.5450
Built Up Area
Whether Inherited N
Purchase Date 1995-08-03
Purchase Cost 10900.00
Development Cost 0.00 83,200 83 Thou+
Pazhavvor Survey No 1285/1 B
Total Area 0.2700
Built Up Area
Whether Inherited N
Purchase Date 1995-08-03
Purchase Cost 5400.00
Development Cost 0.00 41,300 41 Thou+
Pazhavvor Survey No 1285/1C
Total Area 0.4000
Built Up Area
Whether Inherited N
Purchase Date 1995-08-03
Purchase Cost 8000.00
Development Cost 0.00 76,700 76 Thou+
Pazhavvor Survey No 1285/1D
Total Area 0.4200
Built Up Area
Whether Inherited N
Purchase Date 1995-08-03
Purchase Cost 8400.00
Development Cost 0.00 80,600 80 Thou+
Pazhavvor Survey No 1285/1E
Total Area 1.3750
Built Up Area
Whether Inherited N
Purchase Date 1995-08-03
Purchase Cost 27500.00
Development Cost 0.00 2,63,600 2 Lacs+
Pazhavvor Survey No 1285/3H
Total Area 0.0300
Built Up Area
Whether Inherited N
Purchase Date 1995-08-03
Purchase Cost 600.00
Development Cost 0.00 5,800 5 Thou+
Pazhavvor Survey No 1285/3I, J, K
Total Area 0.3500
Built Up Area
Whether Inherited N
Purchase Date 1995-08-03
Purchase Cost 7000.00
Development Cost 0.00 67,100 67 Thou+
Pazhavvor Survey No 1284/2C
Total Area 0.0900
Built Up Area
Whether Inherited N
Purchase Date 1995-08-03
Purchase Cost 1800.00
Development Cost 0.00 17,300 17 Thou+
Pazhavvor Survey No 1284/2B
Total Area 0.4950
Built Up Area
Whether Inherited N
Purchase Date 1995-08-03
Purchase Cost 9900.00
Development Cost 0.00 75,600 75 Thou+
Pazhavvor Survey No 1285/3F
Total Area 0.7000
Built Up Area
Whether Inherited N
Purchase Date 1995-08-03
Purchase Cost 14000.00
Development Cost 0.00 3,79,800 3 Lacs+
Pazhavvor Survey No 1255/2B
Total Area 0.3450
Built Up Area
Whether Inherited N
Purchase Date 2000-04-28
Purchase Cost 24943.00
Development Cost 0.00 1,87,200 1 Lacs+
Pazhavvor Survey No 1255/1C
Total Area 0.3800
Built Up Area
Whether Inherited N
Purchase Date 2000-04-28
Purchase Cost 27474.00
Development Cost 0.00 58,000 58 Thou+
Pazhavvor Survey No 1254/6B
Total Area 0.5400
Built Up Area
Whether Inherited N
Purchase Date 2000-04-28
Purchase Cost 39042.00
Development Cost 0.00 82,500 82 Thou+
Pazhavvor Survey No 1254/6A
Total Area 0.4800
Built Up Area
Whether Inherited N
Purchase Date 2000-04-28
Purchase Cost 34704.00
Development Cost 0.00 73,300 73 Thou+
Pazhavvor Survey No 1254/5B
Total Area 0.2200
Built Up Area
Whether Inherited N
Purchase Date 2000-04-28
Purchase Cost 22000.00
Development Cost 0.00 67,200 67 Thou+
Pazhavvor Survey No 1254/5A
Total Area 0.1000
Built Up Area
Whether Inherited N
Purchase Date 2000-04-28
Purchase Cost 10000.00
Development Cost 0.00 30,600 30 Thou+
Pazhavvor Survey No 1254/3D
Total Area 0.1250
Built Up Area
Whether Inherited N
Purchase Date 2000-04-28
Purchase Cost 12500.00
Development Cost 0.00 38,200 38 Thou+
Pazhavvor Survey No 1254/3C
Total Area 0.2000
Built Up Area
Whether Inherited N
Purchase Date 2000-04-28
Purchase Cost 20000.00
Development Cost 0.00 61,000 61 Thou+
Pazhavvor Survey No 1254/2A ,
Total Area 0.7300
Built Up Area
Whether Inherited N
Purchase Date 2000-04-27
Purchase Cost 73000.00
Development Cost 0.00 2,22,700 2 Lacs+
Pazhavvor Survey No 1386/1,2
Total Area 0.4600
Built Up Area
Whether Inherited N
Purchase Date 2001-03-09
Purchase Cost 40000.00
Development Cost 0.00 1,72,600 1 Lacs+
Total Area
Built Up Area
Whether Inherited N
Purchase Date 0000-00-00
Purchase Cost 0.00
Development Cost 0.00 3,41,900 3 Lacs+
Total Area
Built Up Area
Whether Inherited N
Purchase Date 0000-00-00
Purchase Cost 0.00
Development Cost 0.00 15,400 15 Thou+
Total Area
Built Up Area
Whether Inherited N
Purchase Date 0000-00-00
Purchase Cost 0.00
Development Cost 0.00 95,900 95 Thou+
Total Area
Built Up Area
Whether Inherited N
Purchase Date 0000-00-00
Purchase Cost 0.00
Development Cost 0.00 1,93,000 1 Lacs+
| Nil | Nil | Nil | Nil | Rs 4,69,33,700 4 Crore+ |
ii | Non Agricultural Land | Perungudi Survey no 1976 A/2 With Building
Total Area 0.0400
Built Up Area
Whether Inherited N
Purchase Date 0000-00-00
Purchase Cost 5220.00
Development Cost 0.00 2,34,000 2 Lacs+
Perungudi Survey no 1976A/2
Total Area 0.3200
Built Up Area
Whether Inherited N
Purchase Date 2002-10-11
Purchase Cost 97574.00
Development Cost 0.00 18,71,800 18 Lacs+
Perungudi Survey no 1976A/2
Total Area 0.0263
Built Up Area
Whether Inherited N
Purchase Date 2008-02-01
Purchase Cost 44700.00
Development Cost 0.00 1,53,900 1 Lacs+
Perungudi Survey no 608/2
Total Area 0.2000
Built Up Area
Whether Inherited N
Purchase Date 2012-08-02
Purchase Cost 33600.00
Development Cost 0.00 13,07,600 13 Lacs+
Vallior 1196/1 With building
Total Area 0.0975
Built Up Area
Whether Inherited N
Purchase Date 2004-06-03
Purchase Cost 987500.00
Development Cost 0.00 7,02,600 7 Lacs+
Vallior Survey 1196/1 with Building
Total Area 0.0975
Built Up Area
Whether Inherited N
Purchase Date 2004-05-31
Purchase Cost 990000.00
Development Cost 0.00 9,90,000 9 Lacs+
Vallior Survey No 1465/3B
Total Area 0.1647
Built Up Area
Whether Inherited N
Purchase Date 2008-09-26
Purchase Cost 932900.00
Development Cost 0.00 11,86,800 11 Lacs+
Vallior Survey No 1465/3B
Total Area 0.1647
Built Up Area
Whether Inherited N
Purchase Date 2008-09-26
Purchase Cost 932900.00
Development Cost 0.00 11,86,800 11 Lacs+
Vallior Survey No 1465/3B
Total Area 0.1647
Built Up Area
Whether Inherited N
Purchase Date 2008-09-26
Purchase Cost 932900.00
Development Cost 0.00 11,86,800 11 Lacs+
Vallior Survey No 1478/2C
Total Area 0.1500
Built Up Area
Whether Inherited N
Purchase Date 2008-09-26
Purchase Cost 839700.00
Development Cost 0.00 10,80,900 10 Lacs+
Vallior Survey No 1465/3A
Total Area 0.0246
Built Up Area
Whether Inherited N
Purchase Date 2010-06-22
Purchase Cost 140000.00
Development Cost 0.00 1,77,800 1 Lacs+
Vallior Survey No 1478/2D
Total Area 0.0123
Built Up Area
Whether Inherited N
Purchase Date 2010-06-22
Purchase Cost 70000.00
Development Cost 0.00 88,700 88 Thou+
Vallior Survey No 1464/1A1
Total Area 0.1500
Built Up Area
Whether Inherited N
Purchase Date 2012-03-30
Purchase Cost 849834.00
Development Cost 0.00 10,80,900 10 Lacs+
Vallior Survey No 1464/1A1
Total Area 0.1500
Built Up Area
Whether Inherited N
Purchase Date 2012-03-30
Purchase Cost 849833.00
Development Cost 0.00 10,80,900 10 Lacs+
Vallior Survey No 1464/1A1
Total Area 0.1500
Built Up Area
Whether Inherited N
Purchase Date 2012-03-30
Purchase Cost 849833.00
Development Cost 0.00 10,80,900 10 Lacs+
Sriperumpudur survey no 190/2
Total Area 0.6550
Built Up Area
Whether Inherited N
Purchase Date 2006-08-21
Purchase Cost 1000000.00
Development Cost 0.00 1,42,62,650 1 Crore+
Sriperumpudur survey no184/2
Total Area 1.0100
Built Up Area
Whether Inherited N
Purchase Date 2006-08-21
Purchase Cost 1000000.00
Development Cost 0.00 2,19,92,750 2 Crore+
Sriperumpudur survey no 188/1
Total Area 0.0900
Built Up Area
Whether Inherited N
Purchase Date 2008-04-30
Purchase Cost 477000.00
Development Cost 0.00 19,59,750 19 Lacs+
Sriperumpudur survey no 190/3
Total Area 0.2700
Built Up Area
Whether Inherited N
Purchase Date 2008-04-30
Purchase Cost 1431000.00
Development Cost 0.00 58,79,250 58 Lacs+
Pazahavoor Survry No 379/11
Total Area 0.0800
Built Up Area
Whether Inherited N
Purchase Date 2010-07-02
Purchase Cost 45500.00
Development Cost 0.00 2,72,100 2 Lacs+
Pazahavoor Survey No 382/1C1 & 21B
Total Area 0.3000
Built Up Area
Whether Inherited N
Purchase Date 2011-11-10
Purchase Cost 528400.00
Development Cost 0.00 4,43,300 4 Lacs+
Pazahavoor Survey No 1286 /2 With Well Pump Room
Total Area 0.8300
Built Up Area
Whether Inherited N
Purchase Date 2000-12-11
Purchase Cost 54000.00
Development Cost 0.00 3,33,700 3 Lacs+
Pazahavoor Survey No 1286/2 With Building
Total Area 0.1700
Built Up Area
Whether Inherited N
Purchase Date 2002-08-18
Purchase Cost 24000.00
Development Cost 1500000.00 15,68,400 15 Lacs+
| Asur survey no 9/1B
Total Area 2.6000
Built Up Area
Whether Inherited N
Purchase Date 2010-11-01
Purchase Cost 382925.00
Development Cost 0.00 8,46,400 8 Lacs+
Asur Survey No 9/2
Total Area 0.7300
Built Up Area
Whether Inherited N
Purchase Date 2010-11-01
Purchase Cost 107075.00
Development Cost 0.00 2,37,700 2 Lacs+
Perungudi Survey no 870/1E
Total Area 0.3700
Built Up Area
Whether Inherited N
Purchase Date 2008-01-25
Purchase Cost 270000.00
Development Cost 0.00 16,25,100 16 Lacs+
Pazhavoor Survey no 440/2B
Total Area 0.0950
Built Up Area
Whether Inherited N
Purchase Date 1995-08-03
Purchase Cost 24000.00
Development Cost 0.00 3,58,700 3 Lacs+
Pazhavoor Survey no 441/3
Total Area 0.4100
Built Up Area
Whether Inherited N
Purchase Date 1995-08-03
Purchase Cost 8200.00
Development Cost 0.00 13,94,350 13 Lacs+
Pazhavoor Survey no 440/1A
Total Area 0.0100
Built Up Area
Whether Inherited N
Purchase Date 1995-08-03
Purchase Cost 500.00
Development Cost 0.00 1,500 1 Thou+
Pazhavoor Survey no 440/2
Total Area 0.2000
Built Up Area
Whether Inherited N
Purchase Date 1997-11-03
Purchase Cost 12000.00
Development Cost 0.00 6,80,100 6 Lacs+
Pazhavoor Survey no 440/1A
Total Area 0.00090
Built Up Area
Whether Inherited N
Purchase Date 0197-11-03
Purchase Cost 1800.00
Development Cost 0.00 13,800 13 Thou+
Pazhavoor Survey no 441/2
Total Area 0.4650
Built Up Area
Whether Inherited N
Purchase Date 2001-08-07
Purchase Cost 10100.00
Development Cost 0.00 15,81,350 15 Lacs+
| Nil | Nil | Nil | Nil | Rs 6,68,61,300 6 Crore+ |
v | Others | Perungudi Survey no 582/4
Total Area 0.5800
Built Up Area
Whether Inherited N
Purchase Date 2017-12-28
Purchase Cost 0.00
Development Cost 0.00 33,34,000 33 Lacs+
Perungudi Survey no 582/2
Total Area 0.5400
Built Up Area
Whether Inherited N
Purchase Date 2017-12-28
Purchase Cost 0.00
Development Cost 0.00 31,04,100 31 Lacs+
Perungudi Survey no 582/3
Total Area 0.5900
Built Up Area
Whether Inherited N
Purchase Date 2017-12-28
Purchase Cost 0.00
Development Cost 0.00 31,91,500 31 Lacs+
Perungudi Survey no 575/2A
Total Area 0.2600
Built Up Area
Whether Inherited N
Purchase Date 2017-12-28
Purchase Cost 0.00
Development Cost 0.00 14,94,600 14 Lacs+
Perungudi Survey no
575/2C
Total Area 0.8600
Built Up Area
Whether Inherited N
Purchase Date 2017-12-28
Purchase Cost 0.00
Development Cost 0.00 49,43,500 49 Lacs+
Perungudi Survey no 583/1A
Total Area 0.5600
Built Up Area
Whether Inherited N
Purchase Date 2017-12-28
Purchase Cost 0.00
Development Cost 0.00 32,19,000 32 Lacs+
Perungudi Survey no 575/1A , 1B
Total Area 0.6850
Built Up Area
Whether Inherited N
Purchase Date 2017-12-28
Purchase Cost 0.00
Development Cost 0.00 39,37,500 39 Lacs+
Perungudi Survey no 587/1A
Total Area 0.1000
Built Up Area
Whether Inherited N
Purchase Date 2017-12-28
Purchase Cost 0.00
Development Cost 0.00 5,74,900 5 Lacs+
Perungudi Survey no 584/3
Total Area 1.3100
Built Up Area
Whether Inherited N
Purchase Date 2017-12-28
Purchase Cost 0.00
Development Cost 0.00 2,45,900 2 Lacs+
Perungudi Survey no 587/1B
Total Area 0.6200
Built Up Area
Whether Inherited N
Purchase Date 2017-12-28
Purchase Cost 0.00
Development Cost 0.00 35,63,900 35 Lacs+
Perungudi Survey no 593/3
Total Area 1.1600
Built Up Area
Whether Inherited N
Purchase Date 2017-12-28
Purchase Cost 0.00
Development Cost 0.00 2,17,700 2 Lacs+
Perungudi Survey no 593/2
Total Area 0.9230
Built Up Area
Whether Inherited N
Purchase Date 2017-12-28
Purchase Cost 0.00
Development Cost 0.00 1,73,500 1 Lacs+
Perungudi Survey no 593/1
Total Area 1.0200
Built Up Area
Whether Inherited N
Purchase Date 2017-12-28
Purchase Cost 0.00
Development Cost 0.00 1,91,500 1 Lacs+
Perungudi Survey no 585/2B2, 584/5, 584/6, 585/2A, 587/1D
Total Area 1.7150
Built Up Area
Whether Inherited N
Purchase Date 2017-12-28
Purchase Cost 0.00
Development Cost 0.00 6,12,500 6 Lacs+
Perungudi Survey no 584/4
Total Area 0.4000
Built Up Area
Whether Inherited N
Purchase Date 2017-12-28
Purchase Cost 0.00
Development Cost 0.00 75,100 75 Thou+
Perungudi Survey no 586/1
Total Area 0.9300
Built Up Area
Whether Inherited N
Purchase Date 2017-12-28
Purchase Cost 0.00
Development Cost 0.00 1,74,600 1 Lacs+
Perungudi Survey no 595/2
Total Area 6.0150
Built Up Area
Whether Inherited N
Purchase Date 2017-12-28
Purchase Cost 0.00
Development Cost 0.00 11,29,000 11 Lacs+
Perungudi Survey no 585/2B1
Total Area 0.5600
Built Up Area
Whether Inherited N
Purchase Date 2017-12-28
Purchase Cost 0.00
Development Cost 0.00 1,05,100 1 Lacs+
Perungudi Survey no 584/1
Total Area 0.2100
Built Up Area
Whether Inherited N
Purchase Date 2017-12-28
Purchase Cost 0.00
Development Cost 0.00 39,500 39 Thou+
Perungudi Survey no 582/2
Total Area 0.2200
Built Up Area
Whether Inherited N
Purchase Date 2017-12-28
Purchase Cost 0.00
Development Cost 0.00 41,300 41 Thou+
Perungudi Survey no 585/2B3
Total Area 1.1000
Built Up Area
Whether Inherited N
Purchase Date 2017-12-28
Purchase Cost 0.00
Development Cost 0.00 2,06,500 2 Lacs+
Perungudi Survey no
1509/2
Total Area 1.6200
Built Up Area
Whether Inherited N
Purchase Date 2017-12-28
Purchase Cost 0.00
Development Cost 0.00 3,04,000 3 Lacs+
Perungudi Survey no 583/1B
Total Area 1.2500
Built Up Area
Whether Inherited N
Purchase Date 2017-12-28
Purchase Cost 0.00
Development Cost 0.00 71,85,200 71 Lacs+
Perungudi Survey no 580
Total Area 2.9900
Built Up Area
Whether Inherited N
Purchase Date 2017-12-28
Purchase Cost 0.00
Development Cost 0.00 1,71,87,000 1 Crore+
Perungudi Survey no 581
Total Area 1.8600
Built Up Area
Whether Inherited N
Purchase Date 2017-12-28
Purchase Cost 0.00
Development Cost 0.00 3,49,100 3 Lacs+
Perungudi Survey no 583/1J
Total Area 0.2200
Built Up Area
Whether Inherited N
Purchase Date 2017-12-28
Purchase Cost 0.00
Development Cost 0.00 12,64,600 12 Lacs+
Perungudi Survey no 583/2
Total Area 1.9600
Built Up Area
Whether Inherited N
Purchase Date 2017-12-28
Purchase Cost 0.00
Development Cost 0.00 1,12,66,400 1 Crore+
Perungudi Survey no 583/1L
Total Area 0.1900
Built Up Area
Whether Inherited N
Purchase Date 2017-12-28
Purchase Cost 0.00
Development Cost 0.00 10,92,200 10 Lacs+
Perungudi Survey no 583/1G
Total Area 0.5700
Built Up Area
Whether Inherited N
Purchase Date 2017-12-28
Purchase Cost 0.00
Development Cost 0.00 32,76,500 32 Lacs+
Perungudi Survey no 583/1H
Total Area 0.21000
Built Up Area
Whether Inherited N
Purchase Date 2017-12-28
Purchase Cost 0.00
Development Cost 0.00 12,07,200 12 Lacs+
Perungudi Survey no 583/1D
Total Area 0.1500
Built Up Area
Whether Inherited N
Purchase Date 2017-12-28
Purchase Cost 0.00
Development Cost 0.00 8,62,300 8 Lacs+
Perungudi Survey no 583/1C
Total Area 0.1400
Built Up Area
Whether Inherited N
Purchase Date 2017-12-28
Purchase Cost 0.00
Development Cost 0.00 8,04,500 8 Lacs+
Perungudi Survey no 583/1F
Total Area 0.1500
Built Up Area
Whether Inherited N
Purchase Date 2017-12-28
Purchase Cost 0.00
Development Cost 0.00 8,62,300 8 Lacs+
Perungudi Survey no 583/1E
Total Area 0.1600
Built Up Area
Whether Inherited N
Purchase Date 2017-12-28
Purchase Cost 0.00
Development Cost 0.00 9,19,800 9 Lacs+
Perungudi Survey no 582/1
Total Area 0.5700
Built Up Area
Whether Inherited N
Purchase Date 2017-12-28
Purchase Cost 0.00
Development Cost 0.00 32,76,500 32 Lacs+
Perungudi Survey no 585/2B2, 584/5, 584/6, 585/2A , 587/1D
Total Area 1.7150
Built Up Area
Whether Inherited N
Purchase Date 2017-12-28
Purchase Cost 0.00
Development Cost 0.00 6,12,500 6 Lacs+
| Nil | Nil | Nil | Nil | Nil | Rs 8,10,45,300 8 Crore+ |